Diagnosis Procedure
1.PERFORM INITIALIZATION PROCEDURE
Initialization procedure is executed and operation is confirmed.
2.CHECK SUNROOF SWITCH
Check sunroof switch.
3.CONFIRM THE OPERATION
Confirm the operation again.
Sunshade system does not operate properly
Retained power operation does not operate properlyMain line between ADP and DLC circuit
Diagnosis Procedure
1.CHECK CONNECTOR
Turn the ignition switch OFF.
Disconnect the battery cable from the negative terminal.
Check the following terminals and connectors for damage, bend and
loose connection (connector side
and harness side).
Harness connector B1
Harness connect ...
Tire pressure receiver
Removal and Installation
REMOVAL
Remove instrument lower panel LH. Refer to IP-11, "Removal and
Installation".
Locate tire pressure receiver (1) to the right of the steering column
and disconnect the harness connector from the tire pressure receiver.
Remove tire pressure receiver ...
Power supply and ground circuit
BCM
BCM : Diagnosis Procedure
Regarding Wiring Diagram information, refer to BCS-67, "Wiring Diagram".
1. CHECK FUSE AND FUSIBLE LINK
Check if the following BCM fuses or fusible link are blown.
Is the fuse or fusible link blown?
2. CHECK POWER SUPPLY CIRCUIT
Turn ignition switch OFF.
...