Description
Displays each operation method guide and warning for system malfunction.
Component Function Check
1. CHECK FUNCTION
With CONSULT
Check the operation with ("LCD") in the Active Test.
Diagnosis Procedure
1. CHECK COMBINATION METER
2. CHECK INTERMITTENT INCIDENT
Power supply and ground circuit
AV CONTROL UNIT
AV CONTROL UNIT : Diagnosis Procedure
1.CHECK FUSES
Check that the following fuses of the AV control unit are not blown.
2.POWER SUPPLY CIRCUIT CHECK
Disconnect AV control unit connectors M115 and M119.
Check voltage between the AV control unit connectors M115 and
...
Filament
Inspection and Repair
INSPECTION
When measuring voltage, wrap tin foil around the top of the
negative
probe. Then press the foil against the wire with your finger.
Attach probe circuit tester (in Volt range) to middle portion of
each filament.
If a filament is burne ...
Vertical synchronizing (VP) signal circuit
Description
In composite image (AUX image, camera image), transmit the vertical
synchronizing (VP) signal and horizontal synchronizing (HP) signal from
display unit to AV control unit so as to synchronize the RGB images displayed
with AV control unit, such as the image quality adjusting menu, ...