IPDM E/R (intelligent power distribution module engine room)
NVISRoad test
Description
DESCRIPTION
The purpose of the test is to determine the
overall performance of
CVT and analyze causes of problems.
The road test consists of the following three
parts:
"Check Before Engine Is Started"TM-164.
"Check at ...
Performance test
Inspection
INSPECTION PROCEDURE
Connect recovery/recycling/recharging equipment (for HFC-134a) or
manifold gauge.
Start the engine, and set to the following condition.
Maintain test condition until A/C system becomes stable. (Approximately
10 minutes)
Check that test results ...
IPDM-E branch line circuit
Diagnosis Procedure
1.CHECK CONNECTOR
Turn the ignition switch OFF.
Disconnect the battery cable from the negative terminal.
Check the terminals and connectors of the IPDM E/R for damage,
bend and loose connection (unit side
and connector side).
2.CHECK HARNESS FOR OPEN CIRCUIT
...