Removal and Installation
REMOVAL

INSTALLATION
Installation is in the reverse order of removal.
Filament
HornRGB (G: green) signal circuit
Description
Transmit the image displayed with AV control unit with RGB signal to the
display unit.
Diagnosis Procedure
1.CHECK CONTINUITY RGB (G: GREEN) SIGNAL CIRCUIT
Turn ignition switch OFF.
Disconnect display unit connector M141 and AV control unit
connector M117.
Check conti ...
Preparation
PREPARATION
Special Service Tool
The actual shapes of the tools may differ from those illustrated here.
HFC-134a (R-134a) Service Tool and Equipment
Do not mix HFC-134a (R-134a) refrigerant and/or its specified oil with CFC-12
(R-12) refrigerant and/or its oil.
Separate and non-interchang ...
Diagnosis and repair workflow
Repair Work Flow
WORK FLOW
DETAILED FLOW
1.CUSTOMER INFORMATION
Interview the customer to obtain detailed information about the symptom.
2.PRELIMINARY CHECK
Perform preliminary check
3.SELF-DIAGNOSIS
Perform SELF-DIAGNOSIS.
4.SYMPTOM
Check for symptoms.
5.MALFUNCTIONING PARTS
Repair or ...