Power supply and ground circuit
BCM (body control module)Programming HomeLink for Canadian customers and gate openers
Canadian radio-frequency laws require transmitter
signals to "time-out" (or quit) after several
seconds of transmission - which may not be long
enough for HomeLink to pick up the signal
during training. Similar to this Canadian law,
some U.S. gate operators are designed to "timeout"
in the sam ...
Glove box
Open the glove box by pulling the handle. Use the
master key when locking or unlocking the glove
box.
There is a trunk cancel switch in the glove box.
For additional information, refer to "Cancel
switch" in the "Pre-driving checks and adjustments"
section of this manual.
WARNING
Keep g ...
Intake Valve Timing Control
Exploded View
Intake valve timing control solenoid valve cover gasket (LH)
Intake valve timing control solenoid valve cover gasket (RH)
Intake valve timing control solenoid valve cover (RH) (bank 1)
Intake valve timing control solenoid valve (RH)
Intake valve timing control solenoid va ...