REAR BUMPER
REAR BUMPER : Removal and Installation
REMOVAL
INSTALLATION
Installation is in the reverse order of removal.
Main line between adp and dlc circuit
Diagnosis Procedure
1.CHECK CONNECTOR
Turn the ignition switch OFF.
Disconnect the battery cable from the negative
terminal.
Check the following terminals and connectors for
damage, bend and loose connection (connector side
and harness side).
Harness connec ...
NVIS (NISSAN vehicle immobilizer system-nats)
System Diagram
System Description
INPUT/OUTPUT SIGNAL CHART
SYSTEM DESCRIPTION
The NVIS (NATS) is an anti-theft system. By registering an
Intelligent Key ID into the vehicle, it prevents the
engine being started by an unregistered Intelligent Key. It has a higher
protection again ...
Line pressure test
Inspection and Judgment
INSPECTION
Line Pressure Test Procedure
Inspect the amount of engine oil and replenish
if necessary.
Drive the car for about 10 minutes to warm it
up so that the CVT fluid reaches in the range of 50 to 80C
(122 to 176F). Then inspect the ...