Wiring diagram
Can communication systemStarting the vehicle
1. After starting the engine, fully depress the
foot brake pedal before moving the shift
lever out of the P (Park) position.
2. Keep the foot brake pedal depressed and
move the shift lever into a driving gear.
3. Release the parking brake and the foot brake
pedal, then gradually start the ...
Road test
Description
DESCRIPTION
The purpose of the test is to determine the
overall performance of
CVT and analyze causes of problems.
The road test consists of the following three
parts:
"Check Before Engine Is Started"TM-164.
"Check at ...
P0075, P0081 IVT control solenoid valve
Description
Intake valve timing control solenoid valve is activated by ON/OFF
pulse duty (ratio) signals from the ECM.
The intake valve timing control solenoid valve changes the oil
amount and direction of flow via the intake valve timing control unit
or stops oil flow.
The longer p ...